Winchburgh Campus

West Lothian, Scotland

Metal Technology systems utilised throughout Winchburgh Education Campus

The £60.5m education campus project comprises four new education buildings: Winchburgh Academy – a 660 pupil non-denominational secondary school, Sinclair Academy – a 660 pupil denominational secondary school, Holy Family Primary School – a 231 pupil replacement primary school with nursery and a shared community sports block.

Delivered by Morrison Construction for West Lothian Council and its development partner, Hub South East Scotland Limited, the project was built in response to a significant new housing expansion in the area. Metal Technology Ltd performed an intrinsic technical role in the collaborative design approach with both Ryder Architecture and JM Architects, supplying its high performance range of architectural glazing systems via approved fabricator Albann Limited. Metal Technology products installed were: System 17 Capped Curtain Walling, System 5-35 Hi+ Tilt & Turn Windows, System 4-35 Hi+ Casement Windows, System 5-20D Hi+ Thermal Doors and System 22 Brise Soleil.

Two of the buildings have been shortlisted in the Scottish Property Awards – Winchburgh Schools Campus is a finalist for Development of the Year while Winchburgh Sport and Well-Being Hub is a finalist for the Architectural Excellence Award. An impressive scheme to have been involved in, delivering brilliant new educational facilities for the young people of Winchburgh.

 

 

Winchburgh Campus Click to view the project imagery
  • Client

    West Lothian Council

  • Architect

    Ryder Architecture & JM Architects

  • Main Contractor

    Morrison Construction

  • Fabricator

    Albann Limited

Case Study